Search results

Jump to navigation Jump to search
  • Construction method based on the use of a series of repetitive identical elements. {{languages|Modular construction}}
    262 bytes (31 words) - 01:35, 25 February 2009
  • A construction below ground level used to prevent water seepage. [[Category:7.6 Construction Methods]]
    236 bytes (28 words) - 01:35, 25 February 2009
  • ...of the ease with which concrete can be placed, determined by standard test methods. [[Category:7.6 Construction Methods]]
    264 bytes (33 words) - 01:35, 25 February 2009
  • ...lf-supporting from the previous part of the construction, and is raised as construction proceeds. [[Category:7.6 Construction Methods]]
    398 bytes (47 words) - 00:57, 3 February 2024
  • An intentional separation between parts of a concrete construction. [[Category:7.6 Construction Methods]]
    246 bytes (28 words) - 01:35, 25 February 2009
  • A temporary dam built to exclude water sufficiently to permit construction work within an area normally submerged. [[Category:7.6 Construction Methods]]
    283 bytes (34 words) - 01:35, 25 February 2009
  • ...el chamber which can be lowered to the sea or river bed to give access for construction works. [[Category:7.6 Construction Methods]]
    282 bytes (39 words) - 01:35, 25 February 2009
  • A construction of earth or rock above the natural ground level built to carry a road, rail [[Category:7.6 Construction Methods]]
    291 bytes (39 words) - 01:35, 25 February 2009
  • [[Category:7.6 Construction Methods]]
    206 bytes (23 words) - 01:35, 25 February 2009
  • Note: The term is commonly extended to other mechanical methods (see 7-6-165). [[Category:7.6 Construction Methods]]
    322 bytes (44 words) - 01:35, 25 February 2009
  • [[Category:7.6 Construction Methods]]
    219 bytes (24 words) - 01:35, 25 February 2009
  • Formwork used in the construction of tall walls, towers, concrete roads, etc. which is moved either continuou [[Category:7.6 Construction Methods]]
    383 bytes (48 words) - 01:35, 25 February 2009
  • [[Category:7.6 Construction Methods]]
    205 bytes (24 words) - 01:35, 25 February 2009
  • [[Category:7.6 Construction Methods]]
    199 bytes (24 words) - 01:35, 25 February 2009
  • [[Category:7.6 Construction Methods]]
    206 bytes (24 words) - 01:35, 25 February 2009
  • ...ly 50 to 100 mm thick, used to seal a soil and provide a clean bed for the construction of a reinforced concrete structure. [[Category:7.6 Construction Methods]]
    321 bytes (44 words) - 01:35, 25 February 2009
  • [[Category:7.6 Construction Methods]]
    239 bytes (25 words) - 01:35, 25 February 2009
  • [[Category:7.6 Construction Methods]]
    205 bytes (25 words) - 01:35, 25 February 2009
  • [[Category:7.6 Construction Methods]]
    230 bytes (28 words) - 01:35, 25 February 2009
  • [[Category:7.6 Construction Methods]]
    238 bytes (26 words) - 01:35, 25 February 2009

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)