ARM - ANM (completed 2013) – 16


Download multiple documents

If you would like to download multiple files at a time you can either tick the checkbox next to each document and click the "Download" button or click "Download All". Both buttons are located under the table of results.

Total number of documents

This meeting contains 60 documents.

Agenda No. Title Date
Document title: ANM16-13-2 Proposed Workshops & Seminars 2010-2014 ANM15 comments
12 Aug 2013
Document title: ANM16-output-8 Liaison Note to all Committees & Secretariat on the NAVGUIDE
12 Aug 2013
Document title: ANM16-9-2 Task Working Group on Recommendation O-113
12 Aug 2013
Document title: ANM16-output-13 NAVGUIDE Action Plan
12 Aug 2013
Document title: ANM16-WG2-WP3 - Task 14 Use of audible signals scoping paper
12 Aug 2013
Document title: ANM16-4-2 Report - MSC 88
12 Aug 2013
Document title: ANM16-13-3A IHO-GI-Registry+IALADomain+IMO_Flipchart-DrawingRefined
12 Aug 2013
Document title: ANM16-output-18 Tech Sim Guideline (work in progress edition 01) rev1
12 Aug 2013
Document title: ANM16-WG2-WP4 - Task 16 Master List of Guidelines and Recommendations
12 Aug 2013
Document title: ANM16-output-10 Letter to Netherlands - Review and amendment of IALA Guideline 1058 rev1
12 Aug 2013
Document title: ANM16-13-6 Liaison note from VTS re Data Structures
12 Aug 2013
Document title: ANM16-output-1 draft Final Report_post plenary
12 Aug 2013
Document title: ANM16-WG1-WP1 - Task 1 Draft Guideline on User Requirements and Practical Applications of e-Navigation from Berth to Berth
12 Aug 2013
Document title: ANM16-8-2 Revision to Guideline 1033
12 Aug 2013
Document title: ANM16-output-5 Draft revised IALA Guideline 1078
12 Aug 2013
Document title: ANM16-INF-4 USCG AtoN Strategic Plan
12 Aug 2013
Document title: ANM16-WG2-WP2 - Task 11 Draft revised O-104 Off Station Signals for Major Floating Aids rev1
12 Aug 2013
Document title: ANM16-WG1-WP5 - Task 5 Recommendation marking of wrecks
12 Aug 2013
Document title: ANM16-WG1-WP3 - Task 4 1081 Ed1 VAtoN_Review_Apr2011
12 Aug 2013
Document title: ANM16-output-3 Risk Management seminar proposal
12 Aug 2013
Document title: ANM16-1-2 Action Items from ANM15
12 Aug 2013
Document title: ANM16-9-1 Review and amendment of IALA Guideline 1058
12 Aug 2013
Document title: ANM16-output-4 Marine Spatial Planning workshop proposal
12 Aug 2013
Document title: ANM16-output-19 Summary of USCG Strategic Plan
12 Aug 2013
Document title: ANM16-8-1 Cover note for NAV57 AIS-ATON
12 Aug 2013
Document title: ANM16-WG2-WP5 - Task 18 Tech Sim Guideline (work in progress edition 01) rev1
12 Aug 2013
Document title: ANM16-output-7 Draft revised IALA O-130 rev1
12 Aug 2013
Document title: ANM16-13-4 IALA_Guideline_No_1078_Fairway_AtoN_New_Draft
12 Aug 2013
Document title: ANM16-INF-2 Documentation procedures and quality control
12 Aug 2013
Document title: ANM16-output-12 Draft revised Guideline 1058 - Use of Simulation as a Tool for Waterway Design and AtoN Planning rev1
12 Aug 2013
Document title: ANM16-output-9 Liaison note to EEP16 - draft supplementary simulation guideline rev1
12 Aug 2013
Document title: ANM16-output-2 draft Guideline on the Procedure for the Authorisation of AIS AtoN
12 Aug 2013
Document title: ANM16-4-5 Strategy status of the ANM Committee_ANM15
12 Aug 2013
Document title: ANM16-WG1-WP2 - Task 3 Draft Guideline on AIS Analysis
12 Aug 2013
Document title: ANM16-8-1A NAV57 AIS-ATON ver_1
12 Aug 2013
Document title: ANM16-WG2-WP1 - Task 10 Draft revised Recommendation O-113
12 Aug 2013
Document title: ANM16-output-14 NAVGUIDE Timetable
12 Aug 2013
Document title: ANM16-INF-3 Meeting dates 2010 - 2014_to 9Feb11
12 Aug 2013
Document title: ANM16-4-4 IALAStrtgy_Monitoring_Oct 2010_Numbered
12 Aug 2013
Document title: ANM16-13-1 WG ToR
12 Aug 2013
Document title: ANM16-4-1 1st Draft report of the 50th session
12 Aug 2013
Document title: ANM16-1-1 Agenda
12 Aug 2013
Document title: ANM16-9-3 Use of AtoN in the Design of Fairways and Waterways_review (ver2)
12 Aug 2013
Document title: ANM16-output-16 Liaison Note to Council on need to amend E-110 following revision of the MBS
12 Aug 2013
Document title: ANM16-INF-1 Revised Rules of Procedure for IALA Committees_2010-2014
12 Aug 2013
Document title: ANM16-output-11 ANM response to Contribution of the Netherlands - ANM15-5-5
12 Aug 2013
Document title: ANM16-4-3 PAP20 Report
12 Aug 2013
Document title: ANM16-WG1-WP4 - Task 4 O-143 Ed1 Virtual Aids to Navigation_Review_Apr2011
12 Aug 2013
Document title: ANM16-13-3 Data structures
12 Aug 2013
Document title: ANM16-WG1-WP6 - Task 12 Draft revision of O-139
12 Aug 2013
Document title: ANM16-output-15 Liaison Note to EEP on need to amend E-110 following revision of the MBS
12 Aug 2013
Document title: ANM16-output-17 WG ToR
12 Aug 2013
Document title: ANM16-8-5-Liaison-note-to-EEP-ANM-ePelorus
12 Aug 2013
Document title: ANM16-8-3 Modification to Guideline 1033 Rev1
12 Aug 2013
Document title: ANM16-13-5 Draft revised IALA Guideline 1078
12 Aug 2013
Document title: ANM16-9-4 Netherlands contribution to revision of Guideline 1058
12 Aug 2013
Document title: ANM16-8-4 PIANC MMX Paper Channel AtoN Design_version3b
12 Aug 2013
Document title: ANM16-output-6 Liaison Note to EEP on Availability of synchronised and sequenced buoy lighting systems
12 Aug 2013
Document title: ANM16-INF-5 Operating anomalies identified within ECDIS_Draft for MSC89
12 Aug 2013
Document title: ANM16-9-5 Proposal re emergency wreck mark type of AtoN code for AIS AtoN
12 Aug 2013
Download All