Search results
Jump to navigation
Jump to search
- Construction method based on the use of a series of repetitive identical elements. {{languages|Modular construction}}262 bytes (31 words) - 01:35, 25 February 2009
- A construction below ground level used to prevent water seepage. [[Category:7.6 Construction Methods]]236 bytes (28 words) - 01:35, 25 February 2009
- ...of the ease with which concrete can be placed, determined by standard test methods. [[Category:7.6 Construction Methods]]264 bytes (33 words) - 01:35, 25 February 2009
- ...lf-supporting from the previous part of the construction, and is raised as construction proceeds. [[Category:7.6 Construction Methods]]398 bytes (47 words) - 00:57, 3 February 2024
- An intentional separation between parts of a concrete construction. [[Category:7.6 Construction Methods]]246 bytes (28 words) - 01:35, 25 February 2009
- A temporary dam built to exclude water sufficiently to permit construction work within an area normally submerged. [[Category:7.6 Construction Methods]]283 bytes (34 words) - 01:35, 25 February 2009
- ...el chamber which can be lowered to the sea or river bed to give access for construction works. [[Category:7.6 Construction Methods]]282 bytes (39 words) - 01:35, 25 February 2009
- A construction of earth or rock above the natural ground level built to carry a road, rail [[Category:7.6 Construction Methods]]291 bytes (39 words) - 01:35, 25 February 2009
- [[Category:7.6 Construction Methods]]206 bytes (23 words) - 01:35, 25 February 2009
- Note: The term is commonly extended to other mechanical methods (see 7-6-165). [[Category:7.6 Construction Methods]]322 bytes (44 words) - 01:35, 25 February 2009
- [[Category:7.6 Construction Methods]]219 bytes (24 words) - 01:35, 25 February 2009
- Formwork used in the construction of tall walls, towers, concrete roads, etc. which is moved either continuou [[Category:7.6 Construction Methods]]383 bytes (48 words) - 01:35, 25 February 2009
- [[Category:7.6 Construction Methods]]205 bytes (24 words) - 01:35, 25 February 2009
- [[Category:7.6 Construction Methods]]199 bytes (24 words) - 01:35, 25 February 2009
- [[Category:7.6 Construction Methods]]206 bytes (24 words) - 01:35, 25 February 2009
- ...ly 50 to 100 mm thick, used to seal a soil and provide a clean bed for the construction of a reinforced concrete structure. [[Category:7.6 Construction Methods]]321 bytes (44 words) - 01:35, 25 February 2009
- [[Category:7.6 Construction Methods]]239 bytes (25 words) - 01:35, 25 February 2009
- [[Category:7.6 Construction Methods]]205 bytes (25 words) - 01:35, 25 February 2009
- [[Category:7.6 Construction Methods]]230 bytes (28 words) - 01:35, 25 February 2009
- [[Category:7.6 Construction Methods]]238 bytes (26 words) - 01:35, 25 February 2009