Oldest pages
Jump to navigation
Jump to search
Showing below up to 500 results in range #1,001 to #1,500.
View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)
- Series-wound machine (01:25, 25 February 2009)
- Armature (01:25, 25 February 2009)
- Excitation winding (01:25, 25 February 2009)
- Slip (of an asynchronous machine) (01:25, 25 February 2009)
- Duty factor (of a machine or apparatus) (01:25, 25 February 2009)
- Service conditions (01:25, 25 February 2009)
- Duty (of a machine or apparatus) (01:25, 25 February 2009)
- Operating conditions (01:25, 25 February 2009)
- Synchronous speed (of an electric machine) (01:25, 25 February 2009)
- Uninterrupted duty (01:25, 25 February 2009)
- Diesel generator set (01:25, 25 February 2009)
- Emergency generator set (01:25, 25 February 2009)
- Protected machine (01:25, 25 February 2009)
- Hunting (of an electric machine) (01:25, 25 February 2009)
- Electric generator (01:25, 25 February 2009)
- Response time (01:25, 25 February 2009)
- Direct coupling (01:25, 25 February 2009)
- Rating (of a machine or apparatus) (01:25, 25 February 2009)
- Generator set (01:25, 25 February 2009)
- Automatic self-starting generator set (01:25, 25 February 2009)
- Phase voltage (of a three-phase alternator) (01:25, 25 February 2009)
- Permanent-magnet (01:25, 25 February 2009)
- Single-phase alternator (01:25, 25 February 2009)
- Three-phase alternator (01:25, 25 February 2009)
- Alternator (01:25, 25 February 2009)
- Line voltage (of a three-phase alternator) (01:25, 25 February 2009)
- Direct-current generator (01:25, 25 February 2009)
- Universal motor (01:25, 25 February 2009)
- Direct-current motor (01:25, 25 February 2009)
- Alternating-current motor (01:25, 25 February 2009)
- Slip-ring motor (01:25, 25 February 2009)
- Electric motor (01:25, 25 February 2009)
- Induction motor (01:25, 25 February 2009)
- Synchronous motor (2) (01:25, 25 February 2009)
- Asynchronous motor (01:25, 25 February 2009)
- Parallelling (01:25, 25 February 2009)
- Submersible motor (01:25, 25 February 2009)
- Direct on-line starting (of a motor) (G.B.) (01:25, 25 February 2009)
- Split-phase motor (01:25, 25 February 2009)
- Squirrel-cage motor (01:25, 25 February 2009)
- Starting motor (01:25, 25 February 2009)
- Reactor-start motor (01:25, 25 February 2009)
- Auto-transformer starting (of an a.c. motor) (01:25, 25 February 2009)
- Star-delta starting (of a three-phase motor) (01:25, 25 February 2009)
- Capacitor motor (01:25, 25 February 2009)
- Resistance-start motor (01:25, 25 February 2009)
- Resistance starting (of a motor) (01:25, 25 February 2009)
- Sealed cell (01:25, 25 February 2009)
- Leakproof cell (01:25, 25 February 2009)
- Electrochemical cell (01:25, 25 February 2009)
- Polarisation (of an electrochemical cell) (01:25, 25 February 2009)
- Electrode (2) (01:25, 25 February 2009)
- Secondary cell (01:25, 25 February 2009)
- Air-depolarised cell (01:25, 25 February 2009)
- Chemically-depolarised cell (01:25, 25 February 2009)
- Dry cell (01:25, 25 February 2009)
- Primary cell (01:25, 25 February 2009)
- Electrolyte (01:25, 25 February 2009)
- Emergency battery (01:25, 25 February 2009)
- Nickel-cadmium cell (01:25, 25 February 2009)
- Nickel-iron cell (01:25, 25 February 2009)
- Stationary battery (01:25, 25 February 2009)
- Lead-acid cell (01:25, 25 February 2009)
- Battery (01:25, 25 February 2009)
- Station battery (01:25, 25 February 2009)
- Secondary battery (01:25, 25 February 2009)
- Open-circuit voltage (01:25, 25 February 2009)
- On-load voltage (01:25, 25 February 2009)
- State of charge (01:25, 25 February 2009)
- Discharge (01:25, 25 February 2009)
- End-of-charge voltage (01:25, 25 February 2009)
- Capacity (of a cell or battery) (01:25, 25 February 2009)
- Memory effect (01:25, 25 February 2009)
- Cycle (2) (01:25, 25 February 2009)
- Storage life (01:25, 25 February 2009)
- Equalising charge (01:25, 25 February 2009)
- Depth of discharge (01:25, 25 February 2009)
- Self discharge (01:25, 25 February 2009)
- Terminal (of a cell or battery) (01:25, 25 February 2009)
- Recombination (01:25, 25 February 2009)
- Ampere-hour efficiency (01:25, 25 February 2009)
- Filling plug (01:25, 25 February 2009)
- Separator (01:25, 25 February 2009)
- Hydrometer (01:25, 25 February 2009)
- Vent plug (01:25, 25 February 2009)
- Battery charger (01:25, 25 February 2009)
- Battery lead (01:25, 25 February 2009)
- Trickle charge (01:25, 25 February 2009)
- Spacer (01:25, 25 February 2009)
- Taper charge (01:25, 25 February 2009)
- Battery connected to a power source (01:25, 25 February 2009)
- Distribution network (01:26, 25 February 2009)
- Transmission of electric energy (01:26, 25 February 2009)
- Series connection (of sources) (01:26, 25 February 2009)
- Parallel connection (of sources) (01:26, 25 February 2009)
- Distribution of electric energy (01:26, 25 February 2009)
- Neutral conductor (01:26, 25 February 2009)
- Series-parallel connection (of sources) (01:26, 25 February 2009)
- Earth conductor (01:26, 25 February 2009)
- Line conductor (01:26, 25 February 2009)
- Stranded conductor (01:26, 25 February 2009)
- Earthed neutral system (01:26, 25 February 2009)
- Underground (power) cable (01:26, 25 February 2009)
- Insulated cable (01:26, 25 February 2009)
- Conductor (01:26, 25 February 2009)
- Overhead (power) line (01:26, 25 February 2009)
- Submarine (power) cable (01:26, 25 February 2009)
- Solid conductor (01:26, 25 February 2009)
- Isolated neutral system (01:26, 25 February 2009)
- Power line (01:26, 25 February 2009)
- Braiding (of a cable) (01:26, 25 February 2009)
- Lead-sheathed cable (01:26, 25 February 2009)
- Multicore cable (01:26, 25 February 2009)
- Screened cable (01:26, 25 February 2009)
- Insulator (01:26, 25 February 2009)
- Core (of a cable) (01:26, 25 February 2009)
- Cable terminal box (01:26, 25 February 2009)
- Insulation (of a cable) (01:26, 25 February 2009)
- Insulating material (01:26, 25 February 2009)
- Braided conductor (01:26, 25 February 2009)
- Armour (of a cable) (01:26, 25 February 2009)
- Switching device (01:26, 25 February 2009)
- Rising main (01:26, 25 February 2009)
- Switchgear (01:26, 25 February 2009)
- Switchboard (01:26, 25 February 2009)
- Switch (01:26, 25 February 2009)
- Distribution box (01:26, 25 February 2009)
- Distribution cubicle (01:26, 25 February 2009)
- Ring main (01:26, 25 February 2009)
- Busbar (01:26, 25 February 2009)
- Closed position (of a switch) (01:26, 25 February 2009)
- Contacts (of a switch) (01:26, 25 February 2009)
- Auxiliary contact (01:26, 25 February 2009)
- On-off switch (01:26, 25 February 2009)
- Open position (of a switch) (01:26, 25 February 2009)
- Selector switch (01:26, 25 February 2009)
- Circuit breaker (01:26, 25 February 2009)
- Fuse (01:26, 25 February 2009)
- Reversing switch (01:26, 25 February 2009)
- Push-button (switch) (01:26, 25 February 2009)
- Contactor (01:26, 25 February 2009)
- Fuse carrier (01:26, 25 February 2009)
- Rotary switch (01:26, 25 February 2009)
- Disconnector (01:26, 25 February 2009)
- Earthing switch (01:26, 25 February 2009)
- Fuse link (01:26, 25 February 2009)
- Converter (01:26, 25 February 2009)
- Transformer (01:26, 25 February 2009)
- Auto-transformer (01:26, 25 February 2009)
- Screened transformer (01:26, 25 February 2009)
- Transformation of electric energy (01:26, 25 February 2009)
- Isolating transformer (01:26, 25 February 2009)
- Conversion of electric energy (01:26, 25 February 2009)
- Constant-current transformer (01:26, 25 February 2009)
- Smoothing filter (01:26, 25 February 2009)
- Rectifier (01:26, 25 February 2009)
- Static converter (01:26, 25 February 2009)
- Frequency converter (01:26, 25 February 2009)
- Inverter (01:26, 25 February 2009)
- Phase converter (01:26, 25 February 2009)
- Stabilisation (01:26, 25 February 2009)
- Rotary converter (01:26, 25 February 2009)
- Power pack (01:26, 25 February 2009)
- Stabilised power supply (unit) (01:26, 25 February 2009)
- Voltage stabiliser (01:26, 25 February 2009)
- Electric installation (01:27, 25 February 2009)
- Utilisation of energy (01:27, 25 February 2009)
- Energy consumption (01:27, 25 February 2009)
- Average load (01:27, 25 February 2009)
- Output power (01:27, 25 February 2009)
- Rated power output (01:27, 25 February 2009)
- No-load operation (01:27, 25 February 2009)
- Peak load (01:27, 25 February 2009)
- Full-load operation (01:27, 25 February 2009)
- Off-peak period (01:27, 25 February 2009)
- Off-peak power (01:27, 25 February 2009)
- Installed capacity (01:27, 25 February 2009)
- Utilisation factor (01:27, 25 February 2009)
- Total earthing resistance (01:27, 25 February 2009)
- Earthing conductor (01:27, 25 February 2009)
- Lightning conductor (01:27, 25 February 2009)
- Surge (01:27, 25 February 2009)
- Total loss (01:27, 25 February 2009)
- Earth electrode (01:27, 25 February 2009)
- Surge absorber (01:27, 25 February 2009)
- Phase meter (01:27, 25 February 2009)
- Watt-hour meter (01:27, 25 February 2009)
- Control panel (01:27, 25 February 2009)
- Mimic diagram (01:27, 25 February 2009)
- Potentiometer (01:27, 25 February 2009)
- Control gear (01:27, 25 February 2009)
- Control cubicle (01:27, 25 February 2009)
- Variable auto-transformer (01:27, 25 February 2009)
- Socket and plug connection (01:27, 25 February 2009)
- Alarm system (01:27, 25 February 2009)
- Screen-protected enclosure (or machine) (01:27, 25 February 2009)
- Plug (top) (01:27, 25 February 2009)
- Protected enclosure (or machine) (01:27, 25 February 2009)
- Socket (outlet) (01:27, 25 February 2009)
- Time delay switch (01:27, 25 February 2009)
- Hour meter (01:27, 25 February 2009)
- Photo-electric switch (01:27, 25 February 2009)
- Drip-protected enclosure (or machine) (01:27, 25 February 2009)
- Totally enclosed enclosure (or machine) (01:27, 25 February 2009)
- Flame-protected enclosure (or machine) (01:27, 25 February 2009)
- Splash-protected enclosure (or machine) (01:27, 25 February 2009)
- Weather-protected enclosure (or machine) (01:27, 25 February 2009)
- Water-jet protected enclosure (or machine) (01:27, 25 February 2009)
- Mercury switch (2) (01:29, 25 February 2009)
- Time switch (2) (01:29, 25 February 2009)
- Tower rock light (01:29, 25 February 2009)
- Dike (2) (01:29, 25 February 2009)
- Shore station (01:29, 25 February 2009)
- Jetty (01:29, 25 February 2009)
- Landing (01:29, 25 February 2009)
- Quay (2) (01:29, 25 February 2009)
- Pier (2) (01:29, 25 February 2009)
- Seaward pierhead (01:29, 25 February 2009)
- Breakwater (2) (01:29, 25 February 2009)
- Landing stage (2) (01:29, 25 February 2009)
- Footbridge (01:29, 25 February 2009)
- Engine room (01:29, 25 February 2009)
- Depot (01:29, 25 February 2009)
- Entrance floor (01:29, 25 February 2009)
- Dolphin (01:29, 25 February 2009)
- Rubble mound breakwater (01:29, 25 February 2009)
- Groyne (01:29, 25 February 2009)
- Battery room (01:29, 25 February 2009)
- Set-off (01:29, 25 February 2009)
- Aerial mast (01:29, 25 February 2009)
- Flagpole (01:29, 25 February 2009)
- Lookout (01:29, 25 February 2009)
- Oil store (01:29, 25 February 2009)
- Helipad (01:29, 25 February 2009)
- Service room (01:29, 25 February 2009)
- Septic tank (01:29, 25 February 2009)
- Store room (01:29, 25 February 2009)
- Helideck (01:29, 25 February 2009)
- Frame (01:30, 25 February 2009)
- Substructure (01:30, 25 February 2009)
- Wind bracing (01:30, 25 February 2009)
- Shell (01:30, 25 February 2009)
- Superstructure (01:30, 25 February 2009)
- Portal frame (01:30, 25 February 2009)
- Slab (01:30, 25 February 2009)
- Buttress (01:30, 25 February 2009)
- Footing (01:30, 25 February 2009)
- Abutment (01:30, 25 February 2009)
- Foundation (01:30, 25 February 2009)
- Platform (01:30, 25 February 2009)
- Excavation cover (01:30, 25 February 2009)
- Storey (01:30, 25 February 2009)
- Ground beam (01:30, 25 February 2009)
- Floor (of a room) (01:30, 25 February 2009)
- Curtain wall (01:30, 25 February 2009)
- Plinth (01:30, 25 February 2009)
- Facing wall (01:30, 25 February 2009)
- Bridge pier (01:30, 25 February 2009)
- Dwarf wall (01:30, 25 February 2009)
- Beam (01:30, 25 February 2009)
- Riprap (01:30, 25 February 2009)
- Canopy (01:30, 25 February 2009)
- Bedplate (2) (01:30, 25 February 2009)
- Bar (2) (01:30, 25 February 2009)
- Screen wall (01:30, 25 February 2009)
- Structural member (01:30, 25 February 2009)
- Lattice (2) (01:30, 25 February 2009)
- Crossbeam (01:30, 25 February 2009)
- Joist (01:30, 25 February 2009)
- Shore (01:30, 25 February 2009)
- Guy (01:30, 25 February 2009)
- Brace (01:30, 25 February 2009)
- Rafter (01:30, 25 February 2009)
- Truss (of a roof) (01:30, 25 February 2009)
- Tie (01:30, 25 February 2009)
- Ring beam (01:30, 25 February 2009)
- Strut (01:30, 25 February 2009)
- Service duct (01:30, 25 February 2009)
- Purlin (01:30, 25 February 2009)
- Cantilever (01:30, 25 February 2009)
- Roof batten (01:30, 25 February 2009)
- Pipe (01:30, 25 February 2009)
- Upright (01:30, 25 February 2009)
- Tube (01:30, 25 February 2009)
- Extruded section (01:30, 25 February 2009)
- Fender (01:30, 25 February 2009)
- Plate (01:30, 25 February 2009)
- Rolled section (01:30, 25 February 2009)
- Pile (01:30, 25 February 2009)
- Waling (01:30, 25 February 2009)
- Trestle (01:30, 25 February 2009)
- Cable (2) (01:30, 25 February 2009)
- Web (of a girder) (01:30, 25 February 2009)
- Rib (01:30, 25 February 2009)
- Flange (of a tube or pipe) (01:30, 25 February 2009)
- Gusset plate (01:30, 25 February 2009)
- Flange (of a girder) (01:30, 25 February 2009)
- Section (01:30, 25 February 2009)
- Pile cap (01:30, 25 February 2009)
- Fishplate (01:30, 25 February 2009)
- Nut (01:30, 25 February 2009)
- Stiffener (01:30, 25 February 2009)
- Ring bolt (01:30, 25 February 2009)
- Dog (01:30, 25 February 2009)
- HSFG bolt (01:30, 25 February 2009)
- Screw (01:30, 25 February 2009)
- Eye bolt (01:30, 25 February 2009)
- Plug (masonry) (01:30, 25 February 2009)
- Dowel (01:30, 25 February 2009)
- Bolt (01:30, 25 February 2009)
- Rivet (01:30, 25 February 2009)
- Pin (01:30, 25 February 2009)
- Kerb (01:30, 25 February 2009)
- Cornice (01:30, 25 February 2009)
- Corbel (01:30, 25 February 2009)
- Clamp (01:30, 25 February 2009)
- Coping (01:30, 25 February 2009)
- Dovetail (01:30, 25 February 2009)
- Padstone (01:30, 25 February 2009)
- Stair well (2) (01:30, 25 February 2009)
- Landing (of a stairway) (01:30, 25 February 2009)
- Stair well (01:30, 25 February 2009)
- Bearing (of a load) (01:30, 25 February 2009)
- Mortar bed (01:30, 25 February 2009)
- Damp-proof course (01:30, 25 February 2009)
- Damp-proof membrane (01:30, 25 February 2009)
- Drip (01:30, 25 February 2009)
- Lathing (01:30, 25 February 2009)
- Stringer (01:30, 25 February 2009)
- Parapet (01:30, 25 February 2009)
- Guard-rail (01:30, 25 February 2009)
- Ramp (01:30, 25 February 2009)
- Ladder cage (01:30, 25 February 2009)
- Catwalk (01:30, 25 February 2009)
- Handrail (01:30, 25 February 2009)
- Hatch (01:30, 25 February 2009)
- Ladder hoop (01:30, 25 February 2009)
- Duckboards (01:30, 25 February 2009)
- Lintel (01:30, 25 February 2009)
- Open-mesh flooring (01:30, 25 February 2009)
- Furniture (architectural) (01:30, 25 February 2009)
- Dog step (01:30, 25 February 2009)
- Sill (01:30, 25 February 2009)
- Jamb (01:30, 25 February 2009)
- Door leaf (01:30, 25 February 2009)
- Rebate (01:30, 25 February 2009)
- Door frame (01:30, 25 February 2009)
- Arris (01:30, 25 February 2009)
- Hinge (01:30, 25 February 2009)
- Gutter (01:30, 25 February 2009)
- Gutter (of a roof) (01:30, 25 February 2009)
- Soffit (01:30, 25 February 2009)
- Skirting (01:30, 25 February 2009)
- Drain (01:30, 25 February 2009)
- Drainpipe (01:30, 25 February 2009)
- Wind-vane (01:30, 25 February 2009)
- Ventilator (powered) (01:30, 25 February 2009)
- Lightning conductor (2) (01:30, 25 February 2009)
- Tide gauge (01:30, 25 February 2009)
- Ventilator (passive) (01:30, 25 February 2009)
- Air termination (01:30, 25 February 2009)
- Land drain (01:30, 25 February 2009)
- Diamond pane (01:30, 25 February 2009)
- Screen (01:30, 25 February 2009)
- Weight tube (01:30, 25 February 2009)
- Wrought iron (01:31, 25 February 2009)
- Mild steel (01:31, 25 February 2009)
- Cast iron (01:31, 25 February 2009)
- High tensile steel (01:31, 25 February 2009)
- Steel (01:31, 25 February 2009)
- Iron (01:31, 25 February 2009)
- Gunmetal (01:31, 25 February 2009)
- Copper (01:31, 25 February 2009)
- Aluminium (01:31, 25 February 2009)
- Mill scale (01:31, 25 February 2009)
- Bronze (01:31, 25 February 2009)
- Tin (01:31, 25 February 2009)
- Zinc (01:31, 25 February 2009)
- Alloy (01:31, 25 February 2009)
- Brass (01:31, 25 February 2009)
- Stainless steel (01:31, 25 February 2009)
- Lead (01:31, 25 February 2009)
- Hollow flooring block (01:31, 25 February 2009)
- Slag (01:31, 25 February 2009)
- Granite (01:31, 25 February 2009)
- Gneiss (01:31, 25 February 2009)
- Grout (01:31, 25 February 2009)
- Limestone (01:31, 25 February 2009)
- Pointing (01:31, 25 February 2009)
- Brick (01:31, 25 February 2009)
- Sandstone (01:31, 25 February 2009)
- Ceramic tile (01:31, 25 February 2009)
- Grit (01:31, 25 February 2009)
- Tile (01:31, 25 February 2009)
- Aggregate (01:31, 25 February 2009)
- Corrugated sheet (01:31, 25 February 2009)
- Sieve (01:31, 25 February 2009)
- Shingle (01:31, 25 February 2009)
- Soil classification (01:31, 25 February 2009)
- Slate (01:31, 25 February 2009)
- Mortar (01:31, 25 February 2009)
- Revetment (01:31, 25 February 2009)
- Rubble (stone) (01:31, 25 February 2009)
- Fresh concrete (01:31, 25 February 2009)
- Cement (01:31, 25 February 2009)
- Concrete (01:31, 25 February 2009)
- Reinforced concrete (01:31, 25 February 2009)
- Prestressing (01:31, 25 February 2009)
- Additive (01:31, 25 February 2009)
- Batch (01:31, 25 February 2009)
- Ferro-cement (01:31, 25 February 2009)
- Precast concrete (01:31, 25 February 2009)
- Reinforcing bar (01:31, 25 February 2009)
- Reinforcement (01:31, 25 February 2009)
- Plastic(s) (01:31, 25 February 2009)
- Slaked lime (01:31, 25 February 2009)
- Stirrup (01:31, 25 February 2009)
- Retarder (01:31, 25 February 2009)
- Polymer (01:31, 25 February 2009)
- Accelerator (01:31, 25 February 2009)
- Quick lime (01:31, 25 February 2009)
- Starter bar (01:31, 25 February 2009)
- Gel coat (01:31, 25 February 2009)
- Binder (01:31, 25 February 2009)
- Hardener (01:31, 25 February 2009)
- Thermoplastic (01:31, 25 February 2009)
- Glass wool (01:31, 25 February 2009)
- Glass-reinforced plastic (01:31, 25 February 2009)
- Batten (01:31, 25 February 2009)
- Sterling board (01:31, 25 February 2009)
- Scantling (01:31, 25 February 2009)
- Plywood (01:31, 25 February 2009)
- Plank (01:31, 25 February 2009)
- Chipboard (01:31, 25 February 2009)
- Baulk (01:31, 25 February 2009)
- Log (of wood) (01:31, 25 February 2009)
- Timber (01:31, 25 February 2009)
- Electroplating (01:31, 25 February 2009)
- Metal spraying (01:31, 25 February 2009)
- Anodising (01:31, 25 February 2009)
- Paint (2) (01:31, 25 February 2009)
- Cork board (01:31, 25 February 2009)
- Hot-dip galvanising (01:31, 25 February 2009)
- Primer (01:31, 25 February 2009)
- Cork (01:31, 25 February 2009)
- Corrosion (01:31, 25 February 2009)
- Pickling (01:31, 25 February 2009)
- Coating (01:31, 25 February 2009)
- Pigment (01:31, 25 February 2009)
- Zinc chromate primer (01:31, 25 February 2009)
- Red lead primer (01:31, 25 February 2009)
- Emulsion paint (01:31, 25 February 2009)
- Coat (of paint) (01:31, 25 February 2009)
- Epoxy paint (01:31, 25 February 2009)
- Dye (01:31, 25 February 2009)
- Painting (process) (01:31, 25 February 2009)
- Wash primer (01:31, 25 February 2009)
- Asbestos (01:31, 25 February 2009)
- Surface treatment (01:31, 25 February 2009)
- Material (01:31, 25 February 2009)
- Entonite (01:31, 25 February 2009)
- Shop primer (01:31, 25 February 2009)
- Rendering (01:31, 25 February 2009)
- Water jetting (01:31, 25 February 2009)
- Shot blasting (01:31, 25 February 2009)
- Bitumen (01:31, 25 February 2009)
- Tar (01:31, 25 February 2009)
- Resin (01:31, 25 February 2009)
- Beach (01:34, 25 February 2009)
- Foreshore (01:34, 25 February 2009)
- Backshore (01:34, 25 February 2009)
- Shore (2) (01:34, 25 February 2009)
- Shallows (01:34, 25 February 2009)
- Seabed (01:34, 25 February 2009)
- Sea (2) (01:34, 25 February 2009)
- Coast (01:34, 25 February 2009)
- Tidal flat (01:34, 25 February 2009)
- Wave (2) (01:34, 25 February 2009)
- Fetch (01:34, 25 February 2009)
- Gust of wind (01:34, 25 February 2009)
- Current (01:34, 25 February 2009)
- Swell (2) (01:34, 25 February 2009)
- Ice ridge (01:34, 25 February 2009)
- Fast ice (01:34, 25 February 2009)
- Ice floe (01:34, 25 February 2009)
- Eddy (01:34, 25 February 2009)
- Pack ice (01:34, 25 February 2009)
- Breaking (of waves) (01:34, 25 February 2009)
- Significant wave height (01:34, 25 February 2009)
- Tidal cycle (01:34, 25 February 2009)
- Tidal bore (01:34, 25 February 2009)
- Wave height (01:34, 25 February 2009)
- Tsunami (01:34, 25 February 2009)
- Trough (of a wave) (01:34, 25 February 2009)
- Silt (01:34, 25 February 2009)
- Load-bearing stratum (01:34, 25 February 2009)
- Water level (01:34, 25 February 2009)
- Clay (01:34, 25 February 2009)
- Bedrock (01:34, 25 February 2009)
- Design wave (01:34, 25 February 2009)