Close
to

IALA

ENG - 9


Date: 18/03/2019 to 22/03/2019
Venue: IALA Headquarters

Download multiple documents

If you would like to download multiple files at a time you can either tick the checkbox next to each document and click the "Download" button or click "Download All". Both buttons are located under the table of results.

Total number of documents

This meeting contains 33 documents.

Agenda No. Title Date
1.1 1. Opening
Document title: ENG9-1.1.1 Provisional Agenda 20190129
Originator: IALA Secretariat
01 Feb 2019
1.6.1 1. Opening
Document title: ENG9-1.6.1 ENG8 Action Items
Originator: IALA Secretariat
01 Feb 2019
1.6.2 1. Opening
Document title: ENG9-1.6.2 Report 8th Session IALA ENG Committee ENG8 final
Originator: IALA Secretariat
01 Feb 2019
2.1 2. Review of input papers
Document title: ENG9-2.1 Input paper Committee template
Originator: IALA Secretariat
05 Feb 2019
2.1.1 2. Review of input papers
Document title: ENG9-2.1.1 Liaison Note ARM to ENG re Racons in busy harbours (ARM8-12.1.2)
Originator: ARM8
01 Feb 2019
2.1.2 2. Review of input papers
Document title: ENG9-2.1.2 Liaison Note ARM to IALA Committees re MAtoN lights (ARM8-12.1.3)
Originator: ARM8
01 Feb 2019
2.1.3 2. Review of input papers
Document title: ENG9-2.1.3 Liaison Note on VDES R-Mode to ENG (ARM8-12.1.6)
Originator: ARM8
01 Feb 2019
2.1.4 2. Review of input papers
Document title: ENG9-2.1.4 Comment from Norway re LED light detection with night vision devices
Originator: Norway
01 Feb 2019
2.1.5 2. Review of input papers
Document title: ENG9-2.1.5 Draft Report on the IALA questionnaire 2017
Originator: IALA Secretariat
01 Feb 2019
2.1.6 2. Review of input papers
Document title: ENG9-2.1.6 Report of the IALA Questionnaire 2017
Originator: IALA Secretariat
01 Feb 2019
6.1.1 6. Review of Task Plan and WG expectations
Document title: ENG9-6.1.1 WP ENG Task Plan 2018-22 (ENG8-12.2.1)
Originator: ENG8
01 Feb 2019
6.2.1 6. Review of Task Plan and WG expectations
Document title: ENG9-6.2.1 Task Register 2018-22 at ENG8 (ENG8-12.2.12)
Originator: ENG8
01 Feb 2019
7.0 7. Establish Working Groups
Document title: ENG9-7.1 ENG WG Terms of Reference 20180823 (ENG8-1.6.1)
Originator: ENG8
01 Feb 2019
8.1 8. WG 1 - Visual & Physical AtoN
Document title: ENG9-8.1 WP WG1 Draft Guideline 1133 Ed.1 on Marine Signal Lights Calculation of Luminous Intensity and Range (ENG8-12.2.3)
Originator: ENG8
01 Feb 2019
8.2 8. WG 1 - Visual & Physical AtoN
Document title: ENG9-8.2 WP WG1 Draft Guideline xxxx on Application of Retroreflecting Materials on Marine AtoN (ENG8-12.2.4)
Originator: ENG8
01 Feb 2019
8.3 8. WG 1 - Visual & Physical AtoN
Document title: ENG9-8.3 WP WG1 Draft IALA Recommendation R0111 on Port Traffic Signals (ENG8-12.2.6)
Originator: ENG8
01 Feb 2019
8.4 8. WG 1 - Visual & Physical AtoN
Document title: ENG9-8.4 WP WG1 Estimation of Astragal and Glazing Losses on the Output of an Internally Fitted Integrated Lantern (ENG8-12.2.8)
Originator: ENG8
01 Feb 2019
8.5 8. WG 1 - Visual & Physical AtoN
Document title: ENG9-8.5 WP WG1 Implementation of the Convolution Function to Determine Flash Duration (ENG8-12.2.9)
Originator: ENG8
01 Feb 2019
9.1 9. WG 2 - Knowledge & Sustainability
Document title: ENG9-9.1 WP WG2 Draft IALA Guideline Ed.1 Maintenance of AtoN Structures (ENG8-12.2.2)
Originator: ENG8
01 Feb 2019
9.2 9. WG 2 - Knowledge & Sustainability
Document title: ENG9-9.2 WP WG2 Draft Recommendation on Design and Operation in the Provision of Marine Aids to Navigation (ENG8-12.2.5)
Originator: ENG8
01 Feb 2019
9.3 9. WG 2 - Knowledge & Sustainability
Document title: ENG9-9.3 WP WG2 Draft Guideline on Use of Modern Equipment on Heritage Lighthouses (ENG8-12.2.7)
Originator: ENG8
01 Feb 2019
9.4 9. WG 2 - Knowledge & Sustainability
Document title: ENG9-9.4 WP WG2 Task 2.5.1 Brainstorming (ENG8-12.2.10)
Originator: ENG8
01 Feb 2019
9.5 9. WG 2 - Knowledge & Sustainability
Document title: ENG9-9.5 WP WG2 Task 2.5.2 Brainstorming (ENG8-12.2.11)
Originator: ENG8
01 Feb 2019
9.6 9. WG 2 - Knowledge & Sustainability
Document title: ENG9-9.6 WP WG2 Task 2.5.3 Brainstorming (ENG8-12.2.14)
Originator: ENG8
01 Feb 2019
9.7 9. WG 2 - Knowledge & Sustainability
Document title: ENG9-9.7 WP WG2 Draft Guideline on tidal current signal system_V0.5 (ENG8-12.2.15)
Originator: ENG8
01 Feb 2019
9.8 9. WG 2 - Knowledge & Sustainability
Document title: ENG9-9.8 WP WG2 Revised Guideline G1097 Ed.1 Technical Features and Technology Relevant for Simulation of AtoN (ENG8-12.2.16)
Originator: ENG8
01 Feb 2019
9.9 9. WG 2 - Knowledge & Sustainability
Document title: ENG9-9.9 WG WP2 Report-Uniformity of terminology for Spar Buoy and Buoyant Beacon (ENG8-12.2.17)
Originator: ENG8
01 Feb 2019
9.10 9. WG 2 - Knowledge & Sustainability
Document title: ENG9-9.10 Rapporteur Report on developments in aids to nav (EEP10-05-01)
Originator: EEP10
01 Feb 2019
9.11 9. WG 2 - Knowledge & Sustainability
Document title: ENG9-9.11 Report on investigation into radar reflectors (EEP10-05-01A)
Originator: EEP10
01 Feb 2019
10.1 10. WG3 – Radionavigation Services
Document title: ENG9-10.1 WP WG3 Draft IALA Recommendation Rxxxx on GNSS Augmentation Service Provision (ENG8-12.2.13)
Originator: ENG8
01 Feb 2019
10.2 10. WG3 – Radionavigation Services
Document title: ENG9-10.2 Draft R-Mode Roadmap (ENAV19-13.8)
Originator: ENAV19
01 Feb 2019
10.3 10. WG3 – Radionavigation Services
Document title: ENG9-10.3 R-Mode Mindmap (PDF format - updated 20160316) (ENAV19-13.9.1)
Originator: ENAV19
01 Feb 2019
10.5 10. WG3 – Radionavigation Services
Document title: ENG9-10.5 IALA Roadmap for e-navigation (ENAV19-14.1.5)
Originator: ENAV19
01 Feb 2019
Download All