Committee Dashboards

ARM Dashboard

Action Plan

This Action Plan lists the tasks to be progressed during the current committee session. This is a living document which is kept under frequent review by the Committee Management Team (CMT). Each task has its own Task Group Leader and a dedicated workspace/meeting room. Please e-mail expressions of interest to participate in the work of a given Task Group to the specified Task Group Leader.

WORKING GROUP 1 – NAVIGATIONAL REQUIREMENTS – WG1 Plenary Meeting Room Link

TaskOther Actions / Comments / ExpectationsTask Group Leader and e-mail addressTask Group Workspace
Task 1.2.2
Compile guidance for buoy tender activities
Dave MerrillARM WG1 Meeting Room 9
Task 1.2.6 – Develop further guidance for navigators on the use of AtoN Sophie PlattenARM WG1 Meeting Room 1
Task 1.2.8 – Develop guidance on the provision of AtoN and risk management for autonomous vehicle/vessel operations (Maritime Autonomous Surface Ship, MASS)Nigel HareARM WG1 Meeting Room 7
Task 1.2.9 – Review relevant sections of NAVGUIDE in cooperation with the SecretariatReviewed NAVGUIDEDave MerrillARM WG1 Meeting Room 2
Task 1.1.1 – Monitor IMO work on STCW and develop IMO submissions and supporting advice on amendments to STCW in respect of IALAs inclusion within the Convention to cover AtoN training for navigatorsDevelop a training course and make relevant training material available to enhance mariners’ understanding of AtoN and to facilitate the effective use thereof. IALA Model Course and IMO submission and IALA Secretariat representation at IMO HTW sub-committee session 10 onwards.Sophie PlattenARM WG1 Meeting Room 1
Task 1.4.1 – Enhancing the safety and efficiency of navigation around offshore installationsTo develop comprehensive guidance that will assist members to enhance the safety of navigation and environmental protection in / around offshore renewable energy installations (OREI).Trevor HarrisARM WG1 Meeting Room 3
Task 1.5.1 – Develop a recommendation and guideline consolidating content from G1030, G1035 and G1004.Compile a recommendation and guideline to incorporate all references relating to the Categorization, Availability Objectives (G1030), Availability and Reliability for Short Range Aids to Navigation (G1035), Calculation of Availability (G1004) and relevant text appearing in the 2018 & draft 2023 NAVGUIDE that are not cross-referenced in the aforementioned Guidelines.TBCARM WG1 Meeting Room 8
Task 1.5.2 – Revision of Guideline 1052 on Quality Management in AtoN Service DeliveryRevised Guideline G1052Johan WesterlundARM WG1 Meeting Room 4
Task 1.5.3 – Revise Recommendation R0132  Quality management for AtoN authorities.New edition of R0132,  as proposed by China MSA in ARM 15-7.2.2Johan WesterlundARM WG1 Meeting Room 4
Task 2.2.1 – Develop Recommendation and Guideline on the use of Drones for AtoN inspection and maintenance Naehyuk YooARM WG1 Meeting Room 5
Task 2.2.2 – Full review of A-126, G1084 and other AIS associated documentationConsolidated Recommendation with underlying guidelines following current document structure (initially WG2, correct is WG1)Peter DouglasARM WG1 Meeting Room 6
Task 6.3.1 – Review and update G1062 Establishment of AIS as a Marine Aid to NavigationUpdate to the latest development of AIS; This revision must be reflected in G1022, i.e. MAtoNPeter DouglasARM WG1 Meeting Room 6
Task 6.1.1 – Review G1050 Management and Monitoring of AIS InformationCoordinate with ARM WG3 (IALANET etc)Peter DouglasARM WG1 Meeting Room 6


WORKING GROUP 2 – INFORMATION SERVICES AND PORTRAYAL – WG2 Plenary Meeting Room Link

TaskOther Actions / Comments / ExpectationsTask Group Leader and e-mail addressTask Group Workspace
1.4.3 Develop guidance on cyber security for Marine AtoN. Martijn EbbenARM WG2 Meeting Room 2
2.2.3 Develop an IALA Recommendation and Guideline on developing Harmonized Waterway ConceptAmilynn AdamsARM WG2 Meeting Room 14
5.2.1 Develop a model course on AtoN Cyber Security arrangementsTBCARM WG2 Meeting Room 15
7.1.2 Contribute to the standardization efforts with respect of the requirements of the S-100 domain experts Amilynn AdamsARM WG2 Meeting Room 4
7.1.3 New Guideline on Operational considerations for S-200 (S-201 AtoN information and S-230 Application Specific Messages)TBCARM WG2 Meeting Room 16
7.1.4 Continue to Develop Product Specification S-201. Continue development on S-201, specifically on Maintenance, data validation, and harmonization with S-125, S-124, and S-101 Sewoong OhARM WG2 Meeting Room 5
7.1.6 Continue development on S-125 in coordination with IHO NIPWG. Sewoong OhARM WG2 Meeting Room 6
7.1.7 Continue development on MRN documentation, considering inputs from IALA Secretariat, other committees, or others as needed. Julius Moeller ARM WG2 Meeting Room 7
7.1.8 Review Guideline G1106 on producing an IALA S-200 series Product SpecificationTBCARM WG2 Meeting Room 17
7.1.9 Coordinate Committee support and submissions for IALA representation at IHO working groups in cooperation with Secretariat (HSSC, S-100WG, NIPWG) Eivind MongARM WG2 Meeting Room 8
7.1.10 Monitor the development of S-201 Testbed Sewoong OhARM WG2 Meeting Room 9
7.1.11 Develop, implement and execute procedures for IALA to add, maintain and harmonize items to the IHO S-100 Feature Concept Dictionary(FCD) Minsu Jeon / LeeAnne GordonARM WG2 Meeting Room 10
7.1.12 Create S-200 Implementation Plan, following similar S-100 Implementation Strategy and/or Roadmap Amilynn AdamsARM WG2 Meeting Room 11
7.1.13 Develop guidance on the symbology and portrayal of AtoN for charting Eivind MongARM WG2 Meeting Room 12
7.1.14 Development of technical service specifications for the provision of AtoN informationThomas ChristensenARM WG2 Meeting Room 18
7.1.15 Review Guideline G1159 on ship reporting from the shore‐side perspective TBCARM WG2 Meeting Room 13

WORKING GROUP 3 – RISK MANAGEMENT – WG3 Plenary Meeting Room Link

TaskOther Actions / Comments / ExpectationsTask Group Leader and e-mail addressTask Group Workspace
1.4.4  Review Risk Management related documentation. Update as per ongoing risk toolbox developments. Kevin GregoryWG3 Plenary Meeting Room Link
1.4.5  Develop a method to quantify and evaluate various risk mitigation options Sarah RobinsonWG3 Plenary Meeting Room Link  
1.4.6 Encourage IALA members and other organisations to share historic AIS and other vessel tracking data with IALA. IALA aims to use such data for risk assessment, research and training purposes.TBCWG3 Plenary Meeting Room Link
1.4.7  Conduct a global scan of current risk analysis tools and identify potential candidates for inclusion within the IALA Risk Management Toolbox.   TBD  WG3 Plenary Meeting Room Link
1.4.10 Guideline for Risk Assessment of Cyber Security threats  Guideline for Risk Assessment and Cyber Security including Risk assessment methods Identification of risks, Identification of counter measures, Identification of core elements to ensure cyber security.TBD  WG3 Plenary Meeting Room Link
1.4.11 Develop measures for and a method to monitor waterway risk. Includes effectiveness of risk mitigations, qualitative validation with stakeholders, and re-evaluation of risks.TBDWG3 Plenary Meeting Room Link

Working Group 1 – Navigational Requirements

TaskOther Actions / Comments / ExpectationsTask Group Leader and e-mailTask Group Meetings
1.4.1  Revise Guideline G1052 Quality Management in [Marine] Aids to Navigation Service Delivery (Dec 2013)Expected to be completed at ARM16Johan Westerlund  Meetings
1.5.4  Develop guidance for navigators on the use of AtoNExpected to be complete at ARM16Sophie Platten  Meetings
1.5.7 Develop guidance on the provision of AtoN for autonomous vehicle/vessel operations (Maritime Autonomous Surface Ship, MASS)OngoingGuttorm Tomren  Meetings
1.5.8.1 Revise R0113 marking of Bridges to become a guideline positioned under R0139OngoingTrevor HarrisMeetings
2.2.1a Full review of A-126, G1084 and other AIS associated documentationOngoingJohan Westerlund Meetings  
Consider tasks,  documents to be revised/updated for the next WP CMT 

Working Group 2 – Information Services and Portrayal

TaskOther Actions / Comments / ExpectationsTask Group Leader and e-mailTask Group Meetings
1.2.6 Develop guidance on cyber security for AtoN authorities in collaboration with all other Committees.OngoingMartijn Ebben  Meetings
4.2.1 Maritime Connectivity -Define User Requirements for Maritime Connectivity -Define User Requirements for the Maritime Internet of Things (Define Requirements for MRN Addressing) -Contribute to IALA submission to IMOOngoingR. David Lewald  
5.1.1 Develop guidance on Maritime Services including the production of an ‘e-Navigation Operational Service Description’Ongoing – progress draft input to IMOMichael Strandberg/R. David LewaldMeetings
5.1.2 New Guideline on Operational considerations for S-200 (S-201 AtoN information and S-230 Application Specific Messages)OngoingR. David Lewald  Meetings
5.1.4 Develop Annex C to S-201 Develop Annex C to S-201 PS to Ed.1 OngoingEivind Mong    Meetings
5.1.5 Develop S-125. Draft Product Specification for S-125 to be delivered to IHOOngoingSewoong Oh  Meetings
5.1.8 Develop MRN Registry Submission & Maintenance Guideline for IALA SecretariatDiscussions continue at ARM16LeeAnne Gordon  Meetings
5.1.11 Monitor the development of S-201 TestbedOngoingSewoong Oh  Meetings
5.2.1 Review G1105 shore side portrayal ensuring harmonisation with e-Navigation related information inc. task 5.3.1  OngoingR. David Lewald  Meetings
5.2.2 Develop Guideline on ship reporting from the shore‐side perspectiveDraft 2nd Edition to be completed at ARM16Fred PotMeetings
5.3.1 Develop guidance on the symbology and portrayal of AtoN for chartingInitial discussions in preparation for this task.R. David Lewald –
6.2.1 Joint IMO IHO IALA Workshop regarding the management of S-100 PSDiscussions and possible workshop proposal as output.R. David Lewald –
Consider tasks,  documents to be revised/updated for the next WP CMT 

Working Group 3 – Risk Management

TaskOther Actions / Comments / ExpectationsTask Group Leader and e-mailTask Group Meetings
1.2.1.      Review G1018 Risk Management to ensure compatibility with risk toolbox. Includes full review of underlying Risk Toolbox documentation G1123, G1124, G1138Review Guideline G1138 and Recommendation R1002. Develop supporting risk assessment forms for Guideline G1018 and access to them.Roger Barker Meetings
1.2.4 – In cooperation with ENG (task 1.2.1) revise R0138 and G1058 and G1097 on simulation use by AtoN authorities.Review of Recommendation R0138Roger Barker Meetings
1.2.7.      Develop document to promulgate IALA risk management tool box to IMO (SN circular)Initial drafting at ARM16Roger Barker  Meetings
Consider tasks,  documents to be revised/updated for the next WPConsider the overarching IALA risk management framework.CMT 

ARM 14

Working Group 1 – Navigational Requirements

TaskOther Actions / Comments / ExpectationsTask Group Leader and e-mailTask Group Meetings
1.1.2.     Revise G1054 Preparing for a Voluntary IMO Audit on Aids to Navigation Service Delivery (Nov 2006)Expected to be completed at ARM14Jun Yang  Meetings
1.4.1  Revise Guideline G1052 Quality Management in [Marine] Aids to Nvigation Service Delivery (Dec 2013)Expected to be completed at ARM14Johan Westerlund  Meetings
1.5.1 – Reformat and review the IALA MBS incorporating MAtoN. Needs General Assembly approval.    Expected to be completed at ARM14Natasha McMahon  Meetings
1.5.3 – Undertake gap analysis of IALA guidance associated with the MBS  

1.5.3.1 Review of G1078 The Use of AtoN in the Design of Fairways (June 2011) (part of task 1.5.3)
Expected to be completed at ARM14James Collocott  Meetings
1.5.4  Develop guidance for navigators on the use of AtoN James Collocott   Meetings
1.5.7 Develop guidance on the provision of AtoN for autonomous vehicle/vessel operations (Maritime Autonomous Surface Ship, MASS)To be commenced at ARM14Guttorm Tomren  Meetings
1.5.8 Review and update Recommendation R-0139 on the Marking of Man-Made Offshore Structures to reflect trends in the proliferation of wind farms and other offshore platforms.Expected to be completed at ARM14Trevor Harris  Meetings
1.5.10.1 A-126 (update table for test bits, re MAtoN) Guttorm Tomren Meetings

Working Group 2 – Information Services and Portrayal

TaskOther Actions / Comments / ExpectationsTask Group Leader and e-mailTask Group Meetings
1.2.6 Develop guidance on cyber security for AtoN authorities in collaboration with all other Committees. Possibly complete at Cyber Security workshop. ARM11 – Input for the workshop to be forwarded.Martijn Ebben  Meetings
4.2.1 Maritime ConnectivityR. David Lewald  Meetings
5.1.1 Develop guidance on Maritime Services including the production of an ‘e-Navigation Operational Service Description’Michael Strandberg  Meetings
5.1.2 New Guideline on Operational considerations for S-200 (S-201 AtoN information and S-230 Application Specific Messages)R. David Lewald  Meetings
5.1.4 Develop Annex C to S-201 Develop Annex C to S-201 PS to Ed.1   Eivind Mong    Meetings
5.1.5 Develop S-125. Draft Product Specification for S-125 to be delivered to IHOSewoong Oh  Meetings
5.1.6  Coordination with IHO/WMO for S-100, S-200, and MRN management (S-100/S-200 message coordination with other Committees on S-2xx development)  R. David LewaldMeetings
5.1.8 Develop MRN Registry Submission & Maintenance Guideline for IALA SecretariatExpected to be completed at ARM14LeeAnne Gordon  Meetings
5.1.10 Coordinate Committee support for IALA representation at IHO working groups in cooperation with Secretariat (HSSC, S-100WG, NIPWG)R. David Lewald  Meetings
5.1.11 Monitor the development of S-201 TestbedSewoong Oh  Meetings
5.2.1 Review G1105 shore side portrayal ensuring harmonisation with e-Navigation related information inc. task 5.3.1  R. David Lewald  Meetings
5.2.2 Develop Guideline on ship reporting from the shore‐side perspectiveFred PotMeetings

Working Group 3 – Risk Management

TaskOther Actions / Comments / Expectations Task Group Leader and e-mail Task Group Meetings
1.2.1 Review G1018 Risk Management to ensure compatibility with risk toolbox. Includes full review of underlying Risk Toolbox documentation G1123, G1124, G1138  Expected to be completed at ARM14-Ernst Bolt  Meetings
1.2.1.1 Review of underlying Risk Toolbox documentation – G1138 The Use Of The Simplified IALA Risk Assessment Method (SIRA) (part of task 1.2.1)Expected to be completed at ARM14-  Ed Rogers  Meetings
1.2.1.2 Review of underlying Risk Toolbox documentation -G1124 The Use Of Ports And Waterways Safety Assessment (PAWSA) MkII Tool (part of task 1.2.1)Artur Dias Marques  Meetings
1.2.1.3 Review of underlying Risk Toolbox documentation -G1123 The Use Of IALA Waterway Risk Assessment Programme (IWRAP MKII) (part of task 1.2.1)Jakob Bang  Meetings
1.2.4 – In cooperation with ENG (task 1.2.1) revise R0138 and G1058 and G1097 on simulation use by AtoN authorities.Expected to be completed at ARM14Cathrine Steenberg  Meetings

Other items not listed in the ARM task plan

TaskOther Actions / Comments / Expectations Task Group Leader and e-mail Task Group Meetings
New task proposals for 2022-2026 Work ProgrammeProposals from participants must be made within the task register templateAll working groups –
Revision of IALA StandardsRespond to action from PAPARM Committee Management Team –
NAVGUIDE revisionNatasha McMahon   –

Action Plan – ARM13

The following tasks have been agreed by the ARM Committee Management Team to be progressed during ARM13 through virtual Task Groups (TG).  Each task has a deadline for expressions of interest to participate to the specified Task Group Leader by a certain date. Meetings will be published on the IALA dashboard (login necessary).

Task Other Actions / CommentsTask Group Leader and e-mailDeadline for expressions of interest to participate in a TG Cooperating Working GroupTask Group Meeting Venues
Working Group 1 – Navigational Requirements

ARM13 WG1 TG-1.1.2

1.1.2.     Revise G1054 Preparing for a Voluntary IMO Audit on Aids to Navigation Service Delivery (Nov 2006)

CMSA

Jun Yang

523724224@qq.com

13 April 2021, 17:00 UTC  

ARM13 WG1 TG-1.4.1

1.4.1  Revise Guideline G1052 Quality Management in [Marine] Aids to Navigation Service Delivery (Dec 2013)

Johan Westerlund

Johan.Westerlund@Sjofartsverket.se

13 April 2021, 17:00 UTC 

ARM13 WG1 TG-1.5.1

1.5.1.      Reformat and review the IALA MBS incorporating MAtoN.

Natasha McMahon

natasha.mcmahon@dfo-mpo.gc.ca

13 April 2021, 17:00 UTC 

ARM13 WG1 TG-1.5.3

1.5.3 – Undertake gap analysis of IALA guidance associated with the MBS

 

1.5.3.1 Review of G1078 The Use of AtoN in the Design of Fairways (June 2011) (part of task 1.5.3)

 

 

GAP done

 

 

 

James Collocott

jcollocott@samsa.org.za

 

 

 

13 April 2021, 17:00 UTC

 

 

 

 

 

 

ARM13 WG1 TG-1.5.4

1.5.4  Develop guidance for navigators on the use of AtoN

Beginning after postponement

Guttorm Tomren

guttorm.tomren@kystverket.no

13 April 2021, 17:00 UTC  

ARM13 WG1 TG-1.5.8

1.5.8 Review and update Recommendation R-0139 on the Marking of Man-Made Offshore Structures to reflect trends in the proliferation of wind farms and other offshore platforms.

Kick-off at ARM13

Trevor Harris

trevor.harris@trinityhouse.co.uk

13 April 2021, 17:00 UTC 

ARM13 WG1 TG-1.5.10

1.5.10.1 A-126 (update table for test bits, re MAtoN)

Guttorm Tomren

guttorm.tomren@kystverket.no

13 April 2021, 17:00 UTC  

ARM13 WG1 TG-1.6.1

1.6.1 Review R0143 Provision of virtual aids to navigation and G1081 Virtual AtoN

 

Almost complete

Yves Jacques

yves.jacques@dfo-mpo.gc.ca

13 April 2021, 17:00 UTC

 

 
Working Group 2 – Information Services and Portrayal

ARM13 WG2 TG-1.2.6

1.2.6 Develop guidance on cyber security for AtoN authorities in collaboration with all other Committees. Possibly complete at Cyber Security workshop. ARM11 – Input for the workshop to be forwarded.

R. David Lewald

Robert.D.Lewald@uscg.mil

 

13 April 2021, 17:00 UTC  

ARM13 WG2 TG-4.2.1

4.2.1 Maritime Connectivity

R. David Lewald

Robert.D.Lewald@uscg.mil

 

13 April 2021, 17:00 UTC  

ARM13 WG2 TG-5.1.4

5.1.4 Develop Annex C to S-201

Develop Annex C to S-201 PS to Ed.1

R. David Lewald

Robert.D.Lewald@uscg.mil

 

13 April 2021, 17:00 UTC 

ARM13 WG2 TG-5.1.5

5.1.5 Develop Requirements for S-125. Draft Product Specification for S-125 to be delivered to IHO

Scoping exercise

R. David Lewald

Robert.D.Lewald@uscg.mil

 

13 April 2021, 17:00 UTCIHO-NIPWG 

ARM13 WG2 TG-5.1.6

5.1.6  Coordination with IHO/WMO for S-100, S-200, and MRN management (S-100/S-200 message coordination with other Committees on S-2xx development)

R. David Lewald

Robert.D.Lewald@uscg.mil

 

13 April 2021, 17:00 UTC  

ARM13 WG2 TG-5.1.7

5.1.7 Develop guidance on MRN for users

 

Adjudicate ed.2 and return to Committee

LeeAnne Gordon

NGA-SFHGB USA CIV LeeAnne.E.Gordon@nga.mil

13 April 2021, 17:00 UTCENAV-WG1 

ARM13 WG2 TG-5.1.8

5.1.8 Develop MRN Registry Submission & Maintenance Guideline for IALA Secretariat

R. David Lewald

Robert.D.Lewald@uscg.mil

 

13 April 2021, 17:00 UTC  

ARM13 WG2 TG-5.1.10

5.1.10 Coordinate Committee support for IALA representation at IHO working groups in cooperation with Secretariat (HSSC, S-100WG, NIPWG)

R. David Lewald

Robert.D.Lewald@uscg.mil

 

13 April 2021, 17:00 UTC  

ARM13 WG2 TG-5.1.11

5.1.11 Monitor the development of S-201 Testbed

R. David Lewald

Robert.D.Lewald@uscg.mil

 

13 April 2021, 17:00 UTC  

ARM13 WG2 TG-5.2.1

5.2.1 Review G1105 shore side portrayal ensuring harmonisation with e-Navigation related information

 

R. David Lewald

Robert.D.Lewald@uscg.mil

 

13 April 2021, 17:00 UTC  

ARM13 WG2 TG-5.2.2

5.2.2 Develop Guideline on ship reporting from the shore‐side perspective

Draft Guideline

Fred Pot

fred.pot@bergmann-marine.com

13 April 2021, 17:00 UTC 
Working Group 3 – Risk Management

ARM13 WG3 TG-1.2.1

1.2.1 Review G1018 Risk Management to ensure compatibility with risk toolbox. Includes full review of underlying Risk Toolbox documentation G1123, G1124, G1138

 

Ernst Bolt

ernst.bolt@rws.nl

13 April 2021, 17:00 UTC

 

 

ARM13 WG3 TG-1.2.1.1

1.2.1.1 Review of underlying Risk Toolbox documentation – G1138 The Use Of The Simplified IALA Risk Assessment Method (SIRA) (part of task 1.2.1)

Work will include development of the 1 page Risk Assessment for general AtoN changes.

Roger Barker

roger.barker@trinityhouse.co.uk

13 April 2021, 17:00 UTC

 

 

ARM13 WG3 TG-1.2.1.2

1.2.1.2 Review of underlying Risk Toolbox documentation -G1124 The Use Of Ports And Waterways Safety Assessment (PAWSA) MkII Tool (part of task 1.2.1)

Artur Dias Marques

artur.dias.marques@marinha.pt

13 April 2021, 17:00 UTC

 

 

ARM13 WG3 TG-1.2.1.3

1.2.1.3 Review of underlying Risk Toolbox documentation -G1123 The Use Of IALA Waterway Risk Assessment Programme (IWRAP MKII) (part of task 1.2.1)

Jakob Bang

cjb@dma.dk

13 April 2021, 17:00 UTC

 

 

ARM13 WG3 TG-1.2.2

1.2.2 – Review R0142 Maritime Data Sharing IALA Net to reflect new title “Maritime data sharing” and the storage and use of historical [AIS and other] data for risk analysis. Including:

 

1.2.3 – Review G1086 Global Sharing of Maritime Data (June 2012) in collaboration with task 1.2.2 (R0142 review)

Roger Barker

roger.barker@trinityhouse.co.uk

13 April 2021, 17:00 UTC

 

 

 

 

ARM13 WG3 TG-1.2.4

1.2.4 – In cooperation with ENG (task 1.2.1) revise R0138 and G1058 and G1097 on simulation use by AtoN authorities.

Cathrine Steenberg

cms@force.dk

13 April 2021, 17:00 UTC

 

 

ARM13 WG3 TG-1.2.7

1.2.7 – Develop document to promulgate IALA risk management tool box to IMO (SN circular).

Roger Barker

roger.barker@trinityhouse.co.uk

13 April 2021, 17:00 UTC 

ARM13 WG3 TG-3.1.1

3.1.1 – Review G1020 Training Related to [Marine] Aids to Navigation (Dec 2005)

In cooperation with the WWA.

Roger Barker

roger.barker@trinityhouse.co.uk

13 April 2021, 17:00 UTC 
Other items
New task proposals for 2022-2026 Work ProgrammeProposals from participants must be made within the task register templateAll working groupsNo specific Task Group to be convened on this item.1, 2 ,3
Revision of IALA StandardsRespond to action from PAPARM Committee Management Team
Review / note IALA Drivers and Trends (Ed. 1.3) and IALA Position on the Development of AtoN ServicesRespond to action from PAPARM Committee Management Team1, 2, 3
NAVGUIDE revision

Natasha McMahon

natasha.mcmahon@dfo-mpo.gc.ca

1, 2, 3

 

Coordinate with ENAV and VTS  regarding ITU on the revision of ITU-R M.1371-5 (AIS navigational status)Committee Vice-chair 

Action Plan – ARM12


The following tasks have been agreed by the ARM Committee Management Team to be progressed during ARM12 through virtual Task Groups (TG).  Each task has a deadline for expressions of interest to participate to the specified Task Group Leader by a certain date. Once the participants wishing to work on a task have been identified, the timings of the meetings will be arranged by the Task Group Leader in liaison with the Secretariat. Meetings will be published on the IALA website (login necessary).

Task Other Actions / CommentsTask Group Leader and e-mailDeadline for expressions of interest to participate in a TG Cooperating Working Group

 

Working Group 1 – Navigational Requirements

1.5.1 – Reformat and review the IALA MBS incorporating MAtoN

Natasha McMahon

natasha.mcmahon@dfo-mpo.gc.ca

29 September 1200 UTC
1.5.3 – Undertake gap analysis of IALA guidance associated with the MBS

James Collocott

jcollocott@samsa.org.za

29 September 1200 UTC
Review of G1078 The Use of AtoN in the Design of Fairways (June 2011) (part of task 1.5.3)

James Collocott

jcollocott@samsa.org.za

29 September 1200 UTC
1.5.10 – Develop Guideline on the Use of MAtoN

Trevor Harris

trevor.harris@trinityhouse.co.uk

29 September 1200 UTC
1.5.8 – Review and update Recommendation R-0139 on the Marking of Man-Made Offshore Structures to reflect trends in the proliferation of wind farms and other offshore platforms.

Trevor Harris

trevor.harris@trinityhouse.co.uk

29 September 1200 UTC
1.6.1 – Review R0143 Provision of virtual aids to navigation and G1081 Virtual AtoN

Yves Jaques

yves.jacques@dfo-mpo.gc.ca

29 September 1200 UTC
1.4.1 – Revise Guideline G1052 Quality Management in [Marine] Aids to Navigation Service Delivery (Dec 2013)Review input documents ARM12-7.1.1 and 7.1.1.1

Johan Westerlund

Johan.Westerlund@Sjofartsverket.se

29 September 1200 UTC
1.1.2.      Revise G1054 Preparing for a Voluntary IMO Audit on Aids to Navigation Service Delivery (Nov 2006)New Task Group

Yang Jun

xfcy_yang@qq.com

 

Working Group 2 – Information Services and Portrayal

5.1.7 – Develop guidance on MRN for usersAdjudicate ed.2 and return to Committee

LeeAnne Gordon

NGA-SFHGB USA CIV LeeAnne.E.Gordon@nga.mil

29 September 1200 UTCENAV-WG1
5.1.1 – Develop guidance on Maritime Services including the production of an ‘e-Navigation Operational Service Description’Peter Hooijmans peter.hooijmans@rws.nl29 September 1200 UTCENAV-WG1

5.1.4 – Develop Annex C to S-201

Develop Annex C to S-201 PS to Ed.1

 

Sewong Oh

osw0422@gmail.com

29 September 1200 UTC
5.1.5.  Develop Requirements for S-125. Draft Product Specification for S-125 to be delivered to IHOScoping exercise

R. David Lewald

Robert.D.Lewald@uscg.mil

 

29 September 1200 UTCIHO-NIPWG
5.2.2 – Develop Guideline on ship reporting from the shore‐side perspectiveDraft Guideline

Fred Pot

fred.pot@bergmann-marine.com

29 September 1200 UTC

 

Working Group 3 – Risk Management

1.2.1 – Review G1018 Risk Management to ensure compatibility with risk toolbox. Includes full review of underlying Risk Toolbox documentation G1123, G1124, G1138

Ernst Bolt

ernst.bolt@rws.nl

29 September 1200 UTC

 

Review of underlying Risk Toolbox documentation – G1138 The Use Of The Simplified IALA Risk Assessment Method (SIRA) (part of task 1.2.1)Work will include development of the 1 page Risk Assessment for general AtoN changes.

Roger Barker

roger.barker@trinityhouse.co.uk

29 September 1200 UTC

 

Review of underlying Risk Toolbox documentation -G1124 The Use Of Ports And Waterways Safety Assessment (PAWSA) MkII Tool (part of task 1.2.1)

Cathrine Steenberg

cms@force.dk

29 September 1200 UTC

 

Review of underlying Risk Toolbox documentation -G1123 The Use Of IALA Waterway Risk Assessment Programme (IWRAP MKII) (part of task 1.2.1)

Jakob Bang

cjb@dma.dk

29 September 1200 UTC

 

1.2.2 – Review R0142 Maritime Data Sharing IALA Net to reflect new title “Maritime data sharing” and the storage and use of historical [AIS and other] data for risk analysis. Including:

1.2.3 – Review G1086 Global Sharing of Maritime Data (June 2012) in collaboration with task 1.2.2 (R0142 review)

Roger Barker

roger.barker@trinityhouse.co.uk

29 September 1200 UTC

 

 

 

1.2.4 – In cooperation with ENG (task 1.2.1) revise R0138 and G1058 and G1097 on simulation use by AtoN authorities.

Cathrine Steenberg

cms@force.dk

29 September 1200 UTC

 

1.2.7 – Develop document to promulgate IALA risk management tool box to IMO (SN circular).

Roger Barker

roger.barker@trinityhouse.co.uk

29 September 1200 UTC
3.1.1 – Review G1020 Training Related to [Marine] Aids to Navigation (Dec 2005)In cooperation with the WWA.

Roger Barker

roger.barker@trinityhouse.co.uk

29 September 1200 UTC
Other items
New task proposals for 2022-2026 Work ProgrammeProposals from participants must be made within the task register templateAll working groupsNo specific Task Group to be convened on this item.1, 2 ,3
Revision of IALA StandardsRespond to action from PAPVTS Committee Management TeamCommittee Management Team
e-Nav operational service descriptionAppoint a rapporteur to liaise with ENAV and ARMN/ANo Task Group to be convened on this item.1, 2
3.2.1.          Review relevant sections of NAVGUIDE as requested by SecretariatCoordinated by Natasha McMahon

No Task Group to be convened on this item.

Natasha McMahon will coordinate with the Committee.

1,2,3
IALA Dictionary

No Task Group to be convened on this item.

All task groups to note input document ARM12-3.2.8 when progressing their work.